Climate & energy
Development of solar power plant in Boundiali and Serebou and Extension, reinforcement and upgrading of networks
Côte d'Ivoire
EU commitment (IATI-derived)
€72M
Phase
Announced
Status
Data from 2026-09-01
Pillar
Energy
01 —
Project timeline
5-stage phase tracking
01
Announced
TBD
02
Agreement Signed
TBD
03
Funded / Committed
TBD
04
In Progress
TBD
05
Completed
TBD
02 —
About this project
Source: EU Commission database
Development of solar power plant in Boundiali and Serebou and Extension, reinforcement and upgrading of networks
The project will contribute to the low carbon transition by increasing the production and access to more electricity from renewable energy sources.
03 —
Related projects
Same pillar & region
04 —
News coverage
Independent reporting & monitoring
2025-10-06
Global renewable energy generation surpasses coal for first time - The Guardian
The Guardian
2025-11-07
Renewables take off in East Africa but tariffs too high for many - African Business
African Business
2026-08-14
The launch of the solar energy era - Bundesministerium für wirtschaftliche Zusammenarbeit und Entwicklung
Bundesministerium für wirtschaftliche Zusammenarbeit und Entwicklung
2026-07-27
Can Renewables Industrialize Africa? - Foreign Affairs
Foreign Affairs
2026-07-08
Ivory Coast Inaugurates 52 MW Ferké Solar Power Plant To Strengthen Renewable Energy Capacity - SolarQuarter
SolarQuarter
05 —
Meridian17 Status Assessment
Updated 2026-08-01
The Global Gateway listing for this project describes a €72 million intervention to develop solar power plants in Boundiali and Serebou, alongside network reinforcement across Côte d'Ivoire. As with many projects badged under Global Gateway, the EU's framing should be treated cautiously: Global Gateway frequently repackages pre-existing financing commitments under a new political umbrella, and the IATI data here strongly suggests that is the case.
The most credible financial signal comes from the EU Commission's own IATI records. A project recorded as "Sustainable Energy for Côte d'Ivoire: 30MWp Solar Power Plant in the context of the West African Power Pool" shows a €10 million commitment that has been fully disbursed, with an activity window running from April 2018 to April 2025. The geographic match to northern Côte d'Ivoire and the solar mandate give this a high confidence match to at least one component of the broader initiative. A second and larger IATI record, ENERGOS 2, shows a €72 million commitment dating to May 2017 covering rural electrification and renewable energy in Côte d'Ivoire, though with no disbursement figure recorded. The alignment of this figure with the Global Gateway headline amount is notable, but the match confidence is rated medium and the project's activity window extends to December 2036, suggesting a long-horizon programme rather than a construction-ready scheme. In short, the €72 million figure appears to reflect a legacy commitment from 2016 to 2017 that predates the Global Gateway framework by several years, now presented within it.
No EIB financing has been identified for this project, which limits the available leverage and means independent project-level financial monitoring is thinner than it might otherwise be.
Independent news coverage of the Boundiali and Serebou plants specifically is absent. The closest relevant item is a SolarQuarter report from July 2026 noting the inauguration of a 52 MW solar plant at Ferké, a town in the same northern region of Côte d'Ivoire. This is encouraging context for the country's solar programme but cannot be directly attributed to the Boundiali or Serebou plants without further confirmation.
06 —
Linked EU development finance
IATI activities & commitments
XI-IATI-EC_INTPA-2017-PCC-390384
Sustainable Energy for Côte d'Ivoire : 30MWp Solar Power Plant in the context of the West African Power Pool
- Status
- Active
- Commitment
- €10.0M
Match confidence: high
Both involve 30MWp solar power plant development in northern Côte d'Ivoire (Boundiali area) in energy sector
Both involve 30MWp solar power plant development in northern Côte d'Ivoire (Boundiali area) in energy sector
XI-IATI-EC_INTPA-2016-ACT-D-39393-00
ENERGOS 2-Projet d'appui au secteur de l'énergie en Côte d'Ivoire - Phase 2;
Accès des populations rurales au services électriques, développement des énergies renouvelables, maîtrise de l'énergie
- Status
- Active
- Commitment
- €72.3M
Match confidence: medium
Energy sector support program includes renewable energy development and network reinforcement relevant to solar and grid projects
Energy sector support program includes renewable energy development and network reinforcement relevant to solar and grid projects
XI-IATI-EC_INTPA-2017-PCC-386452
aménagement routiers et facilitation du transport sur le corridor Bamako / Zantiebougou /Boundiali / San Pedro
- Status
- Active
- Commitment
- €28.6M
Match confidence: medium
Road infrastructure project includes Boundiali corridor which supports access to solar plant development site
Road infrastructure project includes Boundiali corridor which supports access to solar plant development site
XI-IATI-EC_INTPA-2020-PCC-415256
Assistance technique pour la coordination de l'appui aux processus d'appel d'offres pour la r¿alisation de centrales ¿ partir d'¿nergies renouvelables
- Status
- Active
- Commitment
- €2.9M
Match confidence: medium
Technical assistance for renewable energy power producer selection (€3M) supports solar and renewable energy infrastructure development
Technical assistance for renewable energy power producer selection (€3M) supports solar and renewable energy infrastructure development